{"id":388,"date":"2026-04-09T07:19:47","date_gmt":"2026-04-09T05:19:47","guid":{"rendered":"https:\/\/zenerg.hr\/blog\/?p=388"},"modified":"2026-04-13T07:05:55","modified_gmt":"2026-04-13T05:05:55","slug":"subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic","status":"publish","type":"post","link":"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/","title":{"rendered":"Subvencije za solarnu elektranu 2026 \u2014 FZOEU natje\u010daj 38 mil EUR vodi\u010d"},"content":{"rendered":"\n<p>\u270d\ufe0f&nbsp;<strong>Jurica Brekalo \u0160trbi\u0107<\/strong>&nbsp;\u2014 Ovla\u0161teni instalater solarnih sustava, diplomirani in\u017eenjer elektrotehnike (FER). Osniva\u010d Zenerg d.o.o., 200+ instalacija u Hrvatskoj.&nbsp;<a href=\"https:\/\/zenerg.hr\/o-nama\/\">Saznajte vi\u0161e \u2192<\/a><\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_82_2 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#FZOEU_natjecaj\" >FZOEU natje\u010daj<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Sadrzaj\" >Sadr\u017eaj<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#FZOEU_natjecaj_2026_%E2%80%94_potvrdeni_parametri\" >FZOEU natje\u010daj 2026 \u2014 potvr\u0111eni parametri<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Maksimalni_iznosi_subvencije_po_mjeri\" >Maksimalni iznosi subvencije po mjeri<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Tko_se_moze_prijaviti_%E2%80%94_uvjeti\" >Tko se mo\u017ee prijaviti \u2014 uvjeti<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Koliko_novca_mozete_dobiti_%E2%80%94_izracun_za_vas_sustav\" >Koliko novca mo\u017eete dobiti \u2014 izra\u010dun za va\u0161 sustav<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Kompletni_popis_dokumentacije_%E2%80%94_checklist\" >Kompletni popis dokumentacije \u2014 checklist<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Scenarij_A_Prijava_s_OOMP-om_PRIJE_ugradnje_%E2%80%94_moguca_novost_za_2026\" >Scenarij A: Prijava s OOMP-om (PRIJE ugradnje) \u2014 mogu\u0107a novost za 2026.<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Scenarij_B_Prijava_s_gotovom_elektranom_dosadasnji_model\" >Scenarij B: Prijava s gotovom elektranom (dosada\u0161nji model)<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Vremenski_plan_Subvencije_solarne_elektrane_2026_%E2%80%94_kad_sto_pripremiti\" >Vremenski plan: Subvencije solarne elektrane 2026 \u2014 kad \u0161to pripremiti<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Ako_vrijedi_Scenarij_A_dovoljan_OOMP_bez_gotove_elektrane\" >Ako vrijedi Scenarij A (dovoljan OOMP, bez gotove elektrane)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Ako_vrijedi_Scenarij_B_mora_biti_gotova_elektrana_dosadasnji_model\" >Ako vrijedi Scenarij B (mora biti gotova elektrana, dosada\u0161nji model)<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Korak_1_Odabir_instalera_i_glavni_projekt\" >Korak 1: Odabir instalera i glavni projekt<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Korak_2_HEP_suglasnost_EES_ili_OOMP\" >Korak 2: HEP suglasnost (EES ili OOMP)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Korak_3_Montaza_i_pustanje_u_pogon\" >Korak 3: Monta\u017ea i pu\u0161tanje u pogon<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Korak_4_Prijava_na_eFZOEU_%E2%80%94_dan_D\" >Korak 4: Prijava na eFZOEU \u2014 dan D<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Sto_pripremiti_za_dan_prijave\" >\u0160to pripremiti za dan prijave<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Kako_izgleda_sam_proces_prijave\" >Kako izgleda sam proces prijave<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Korak_5_Nakon_prijave_%E2%80%94_sto_ocekivati\" >Korak 5: Nakon prijave \u2014 \u0161to o\u010dekivati<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#7_gresaka_koje_ubijaju_prijavu_za_subvencije_solarne_elektrane_2026\" >7 gre\u0161aka koje ubijaju prijavu za subvencije solarne elektrane 2026<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Greska_1_Cekanje_objave_natjecaja_da_se_krene_s_pripremom\" >Gre\u0161ka 1: \u010cekanje objave natje\u010daja da se krene s pripremom<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Greska_2_Nepotpuna_dokumentacija\" >Gre\u0161ka 2: Nepotpuna dokumentacija<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Greska_3_Projekt_ne_odgovara_stvarno_ugradenoj_opremi\" >Gre\u0161ka 3: Projekt ne odgovara stvarno ugra\u0111enoj opremi<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Greska_4_Paneli_ne_zadovoljavaju_tehnicki_minimum\" >Gre\u0161ka 4: Paneli ne zadovoljavaju tehni\u010dki minimum<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Greska_5_Kuca_nije_legalizirana\" >Gre\u0161ka 5: Ku\u0107a nije legalizirana<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Greska_6_Neispravan_pristup_eGradani_na_dan_prijave\" >Gre\u0161ka 6: Neispravan pristup eGra\u0111ani na dan prijave<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Greska_7_Odabir_instalera_koji_ne_poznaje_FZOEU_proceduru\" >Gre\u0161ka 7: Odabir instalera koji ne poznaje FZOEU proceduru<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Lokalne_subvencije_%E2%80%94_dodatnih_400%E2%80%931000_E_povrh_FZOEU\" >Lokalne subvencije \u2014 dodatnih 400\u20131.000 \u20ac povrh FZOEU<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Najcesca_pitanja_o_subvencijama_za_solarne_elektrane_2026\" >Naj\u010de\u0161\u0107a pitanja o subvencijama za solarne elektrane 2026<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/zenerg.hr\/blog\/subvencije-solarne-elektrane-2026-fzoeu-natjecaj-vodic\/#Zakljucak_%E2%80%94_subvencije_solarne_elektrane_2026_%E2%80%94_ne_cekajte_natjecaj_pripremite_se_sad\" >Zaklju\u010dak \u2014 subvencije solarne elektrane 2026 \u2014 ne \u010dekajte natje\u010daj, pripremite se sad<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FZOEU_natjecaj\"><\/span> FZOEU natje\u010daj<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>FZOEU natje\u010daj za subvencije za solarne elektrane u 2026. godini je slu\u017ebeno najavljen \u2014 ukupni bud\u017eet je&nbsp;<strong>38 milijuna eura<\/strong>, gotovo dvostruko vi\u0161e od pro\u0161le godine. Sufinanciranje do 50% za standardna ku\u0107anstva, a \u010dak do&nbsp;<strong>70% za ku\u0107anstva u riziku od energetskog siroma\u0161tva<\/strong>. Za vas to konkretno zna\u010di: solarna elektrana od 9.800 \u20ac mo\u017ee vas ko\u0161tati ispod 5.000 \u20ac iz vlastitog d\u017eepa. A ako dodate bateriju \u2014 za nju postoji zasebnih 8 milijuna eura.<\/p>\n\n\n\n<p>Nacrt javnog poziva je na&nbsp;<strong>javnom savjetovanju do 7. svibnja 2026.<\/strong>, nakon \u010dega slijedi objava finalnog poziva. Ali \u2014 iskustvo iz prethodnih godina jasno pokazuje: tko \u010deka objavu da tek onda krene s pripremom, ostaje bez subvencije. Procedura isho\u0111enja dokumentacije traje dulje od roka natje\u010daja.<\/p>\n\n\n\n<p>Subvencije solarne elektrane 2026 nikad nisu bile izda\u0161nije. U ovom vodi\u010du prolazim kroz cijeli postupak \u2014 od pripreme dokumentacije PRIJE objave natje\u010daja, preko same prijave na <a href=\"https:\/\/efzoeu.fzoeu.hr\/\" target=\"_blank\" rel=\"noopener\">eFZOEU sustav<\/a>, do isplate sredstava. Sve s konkretnim rokovima, popisom dokumenata, i savjetima iz iskustva s preko 200 instalacija od kojih smo dobar dio uspje\u0161no proveli kroz FZOEU proceduru.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sadrzaj\"><\/span>Sadr\u017eaj<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#sto-se-ocekuje\" target=\"_blank\" rel=\"noopener\">FZOEU natje\u010daj 2026 \u2014 potvr\u0111eni parametri<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#tko-se-moze\" target=\"_blank\" rel=\"noopener\">Tko se mo\u017ee prijaviti \u2014 uvjeti<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#koliko-novca\" target=\"_blank\" rel=\"noopener\">Koliko novca mo\u017eete dobiti \u2014 izra\u010dun za va\u0161 sustav<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#dokumentacija\" target=\"_blank\" rel=\"noopener\">Subvencije solarne elektrane 2026 \u2014 kompletni popis dokumentacije \u2014 checklist<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#vremenski-plan\" target=\"_blank\" rel=\"noopener\">Vremenski plan: Kad \u0161to pripremiti<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#korak-1\" target=\"_blank\" rel=\"noopener\">Korak 1: Odabir instalera i glavni projekt<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#korak-2\" target=\"_blank\" rel=\"noopener\">Korak 2: HEP suglasnost (EES ili OOMP)<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#korak-3\" target=\"_blank\" rel=\"noopener\">Korak 3: Monta\u017ea i pu\u0161tanje u pogon<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#korak-4\" target=\"_blank\" rel=\"noopener\">Korak 4: Prijava na eFZOEU \u2014 dan D<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#korak-5\" target=\"_blank\" rel=\"noopener\">Korak 5: Nakon prijave \u2014 \u0161to o\u010dekivati<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#najcesce-greske\" target=\"_blank\" rel=\"noopener\">7 naj\u010de\u0161\u0107ih gre\u0161aka koje ubijaju prijavu<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#lokalne-subvencije\" target=\"_blank\" rel=\"noopener\">Lokalne subvencije \u2014 dodatnih 400\u20131.000 \u20ac povrh FZOEU<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.claudeusercontent.com\/?domain=claude.ai&amp;parentOrigin=https%3A%2F%2Fclaude.ai&amp;errorReportingMode=parent&amp;formattedSpreadsheets=true#faq\" target=\"_blank\" rel=\"noopener\">Naj\u010de\u0161\u0107a pitanja o subvencijama<\/a><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"sto-se-ocekuje\"><span class=\"ez-toc-section\" id=\"FZOEU_natjecaj_2026_%E2%80%94_potvrdeni_parametri\"><\/span>FZOEU natje\u010daj 2026 \u2014 potvr\u0111eni parametri<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>U okviru&nbsp;<strong>10. paketa mjera Vlade RH<\/strong>, Fond za za\u0161titu okoli\u0161a u suradnji s Ministarstvom za\u0161tite okoli\u0161a i zelene tranzicije objavio je parametre novog programa. Ministrica Marija Vu\u010dkovi\u0107 i direktor Fonda Luka Balen predstavili su detalje na konferenciji za novinare:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th class=\"has-text-align-left\" data-align=\"left\">Parametar<\/th><th class=\"has-text-align-left\" data-align=\"left\">2026. \u2014 POTVR\u0110ENO<\/th><th class=\"has-text-align-left\" data-align=\"left\">Za usporedbu \u2014 2025.<\/th><\/tr><tr><td>Ukupni bud\u017eet programa<\/td><td>38 milijuna EUR<\/td><td>10 mil EUR (kasnije 20,5 mil)<\/td><\/tr><tr><td>\u2014 od toga fotonaponske elektrane<\/td><td>20 milijuna EUR<\/td><td>10 mil EUR<\/td><\/tr><tr><td>\u2014 od toga dizalice topline<\/td><td>10 milijuna EUR<\/td><td>Zasebni natje\u010daj<\/td><\/tr><tr><td>\u2014 od toga baterijski sustavi<\/td><td>8 milijuna EUR (NOVO!)<\/td><td>Nije bilo<\/td><\/tr><tr><td>Sufinanciranje \u2014 standardna ku\u0107anstva<\/td><td>Do 50% opravdanih tro\u0161kova<\/td><td>50%, maks. 600 \u20ac\/kW<\/td><\/tr><tr><td>Sufinanciranje \u2014 energetsko siroma\u0161tvo<\/td><td>Do 70% opravdanih tro\u0161kova (NOVO!)<\/td><td>Nije bilo<\/td><\/tr><tr><td>Prijava<\/td><td>Elektroni\u010dki, eFZOEU sustav (<a href=\"https:\/\/gov.hr\/\" target=\"_blank\" rel=\"noopener\">eGra\u0111ani<\/a>)<\/td><td>Isto<\/td><\/tr><tr><td>Status<\/td><td>Javno savjetovanje do 7. svibnja 2026.<\/td><td>\u2014<\/td><\/tr><\/tbody><\/table>\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/zenerg.hr\/blog\/wp-content\/uploads\/2026\/04\/natjecaj-2026.png\" alt=\"Subvencije solarne elektrane 2026 \u2014 FZOEU natje\u010daj 38 milijuna EUR infografika\" class=\"wp-image-393\" width=\"1200\" height=\"630\"\/><\/figure>\n<\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Maksimalni_iznosi_subvencije_po_mjeri\"><\/span>Maksimalni iznosi subvencije po mjeri<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Ovo su potvr\u0111eni rasponi iznosa potpore (ni\u017ei iznos za 50% sufinanciranja, vi\u0161i za 70% za ku\u0107anstva u energetskom siroma\u0161tvu):<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th class=\"has-text-align-left\" data-align=\"left\">Mjera<\/th><th class=\"has-text-align-right\" data-align=\"right\">Bud\u017eet<\/th><th class=\"has-text-align-right\" data-align=\"right\">Subvencija (50%)<\/th><th class=\"has-text-align-right\" data-align=\"right\">Subvencija (70%, ener. siroma\u0161tvo)<\/th><\/tr><tr><td>Fotonaponska elektrana<\/td><td class=\"has-text-align-right\" data-align=\"right\">20 mil EUR<\/td><td class=\"has-text-align-right\" data-align=\"right\">Do 6.000 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">Do 8.400 \u20ac<\/td><\/tr><tr><td>Baterijski sustav (uz FNE)<\/td><td class=\"has-text-align-right\" data-align=\"right\">8 mil EUR<\/td><td class=\"has-text-align-right\" data-align=\"right\">Do 5.600 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">Do 7.840 \u20ac<\/td><\/tr><tr><td>Dizalica topline<\/td><td class=\"has-text-align-right\" data-align=\"right\">10 mil EUR<\/td><td class=\"has-text-align-right\" data-align=\"right\">Do 6.250 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">Do 8.750 \u20ac<\/td><\/tr><tr><td>UKUPNO (FNE + baterija)<\/td><td class=\"has-text-align-right\" data-align=\"right\">28 mil EUR<\/td><td class=\"has-text-align-right\" data-align=\"right\">Do 11.600 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">Do 16.240 \u20ac<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>\u0160to to zna\u010di u praksi:<\/strong>&nbsp;Ako instalirate solarnu elektranu od 10 kW s baterijom od 10 kWh (na\u0161 paket za 9.800 \u20ac), teoretski mo\u017eete dobiti do&nbsp;<strong>11.600 \u20ac subvencije<\/strong>&nbsp;\u2014 \u0161to je vi\u0161e od cijene sustava. Naravno, subvencija ne mo\u017ee prema\u0161iti stvarni tro\u0161ak, ali brojke jasno pokazuju koliko je program izda\u0161an.<\/p>\n\n\n\n<p><strong>Va\u017ena napomena o baterijama:<\/strong>&nbsp;Direktor Balen je naglasio da se subvencija za baterije dodjeljuje&nbsp;<strong>isklju\u010divo kao dodatna mjera uz fotonaponsku elektranu<\/strong>&nbsp;\u2014 ne mo\u017eete dobiti subvenciju samo za bateriju bez solarne elektrane.<\/p>\n\n\n\n<p><strong>Socijalna komponenta:<\/strong>&nbsp;Ku\u0107anstva u riziku od energetskog siroma\u0161tva (ovisno o ukupnoj visini dohotka) mogu ostvariti do 70% sufinanciranja. Ovo je nova mjera koja prvi put omogu\u0107uje pristup zelenoj energiji i obiteljima s ni\u017eim primanjima.<\/p>\n\n\n\n<p>\ud83d\udccb Javno savjetovanje \u2014 va\u0161a prilika za utjecaj<\/p>\n\n\n\n<p>Subvencije solarne elektrane 2026 su u pripremi \u2014 nacrt javnog poziva je na javnom savjetovanju&nbsp;<strong>do 7. svibnja 2026.<\/strong>&nbsp;Svi zainteresirani mogu dostaviti prijedloge i komentare na:&nbsp;<a href=\"mailto:e-savjetovanje@fzoeu.hr\">e-savjetovanje@fzoeu.hr<\/a><\/p>\n\n\n\n<p>Nakon savjetovanja, FZOEU \u0107e razmotriti komentare i objaviti finalni poziv. To zna\u010di da se natje\u010daj o\u010dekuje&nbsp;<strong>krajem svibnja ili po\u010detkom lipnja 2026.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"tko-se-moze\"><span class=\"ez-toc-section\" id=\"Tko_se_moze_prijaviti_%E2%80%94_uvjeti\"><\/span>Tko se mo\u017ee prijaviti \u2014 uvjeti<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Na temelju potvr\u0111enih informacija s konferencije za novinare, pravo na prijavu imaju:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Fizi\u010dke osobe<\/strong>&nbsp;\u2014 vlasnici ili suvlasnici postoje\u0107e obiteljske ku\u0107e<\/li>\n\n\n\n<li>Prijavitelj mora imati&nbsp;<strong>prijavljeno prebivali\u0161te<\/strong>&nbsp;na adresi ku\u0107e<\/li>\n\n\n\n<li>Ku\u0107a mora biti&nbsp;<strong>legalno izgra\u0111ena<\/strong>&nbsp;(zakonita) i ispunjavati propisane tehni\u010dke uvjete<\/li>\n\n\n\n<li>Fotonaponski paneli moraju imati&nbsp;<strong>stupanj korisnog djelovanja najmanje 18%<\/strong>&nbsp;(svi moderni Tier 1 paneli to zadovoljavaju \u2014 Trina 455W ima 22,5%)<\/li>\n\n\n\n<li><strong>Za dizalice topline dodatni uvjet:<\/strong>&nbsp;ku\u0107a mora imati energetski razred najmanje&nbsp;<strong>C u kontinentalnoj Hrvatskoj<\/strong>&nbsp;ili&nbsp;<strong>B u primorskoj Hrvatskoj<\/strong><\/li>\n\n\n\n<li>Baterijski sustav se mo\u017ee subvencionirati&nbsp;<strong>isklju\u010divo uz fotonaponsku elektranu<\/strong>&nbsp;\u2014 ne zasebno<\/li>\n<\/ul>\n\n\n\n<p><strong>Tko se NE mo\u017ee prijaviti:<\/strong>&nbsp;Pravne osobe (za tvrtke postoje zasebni programi), vlasnici novih ku\u0107a u izgradnji, vlasnici nelegalnih objekata, te osobe koje su ve\u0107 koristile sufinanciranje FZOEU-a za istu namjenu.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"koliko-novca\"><span class=\"ez-toc-section\" id=\"Koliko_novca_mozete_dobiti_%E2%80%94_izracun_za_vas_sustav\"><\/span>Koliko novca mo\u017eete dobiti \u2014 izra\u010dun za va\u0161 sustav<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Zahvaljuju\u0107i subvencijama za solarne elektrane u 2026., s novim parametrima \u2014 do 6.000 \u20ac za FNE i do 5.600 \u20ac za bateriju \u2014 pogledajmo konkretne brojke za na\u0161e&nbsp;<a href=\"https:\/\/zenerg.hr\/blog\/koliko-stvarno-kosta-solarna-elektrana-u-2026-transparentni-cjenik-od-instalera\/\">pakete<\/a>:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th class=\"has-text-align-left\" data-align=\"left\">Zenerg paket<\/th><th class=\"has-text-align-right\" data-align=\"right\">Cijena<\/th><th class=\"has-text-align-right\" data-align=\"right\">Subvencija FNE (50%)<\/th><th class=\"has-text-align-right\" data-align=\"right\">Subvencija baterija (50%)<\/th><th class=\"has-text-align-right\" data-align=\"right\">Ukupna subvencija<\/th><th class=\"has-text-align-right\" data-align=\"right\">Vi pla\u0107ate<\/th><\/tr><tr><td>5 kW + 5 kWh bat.<\/td><td class=\"has-text-align-right\" data-align=\"right\">6.500 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~2.500 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~1.000 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~3.500 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~3.000 \u20ac<\/td><\/tr><tr><td>8 kW + 5 kWh bat.<\/td><td class=\"has-text-align-right\" data-align=\"right\">8.100 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~3.500 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~1.000 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~4.500 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~3.600 \u20ac<\/td><\/tr><tr><td><strong>10 kW + 10 kWh bat. \u2b50<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>9.800 \u20ac<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>~4.500 \u20ac<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>~1.800 \u20ac<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>~6.300 \u20ac<\/strong><\/td><td class=\"has-text-align-right\" data-align=\"right\"><strong>~3.500 \u20ac<\/strong><\/td><\/tr><tr><td>15 kW + 15 kWh bat.<\/td><td class=\"has-text-align-right\" data-align=\"right\">11.500 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~5.750 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~2.500 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~8.250 \u20ac<\/td><td class=\"has-text-align-right\" data-align=\"right\">~3.250 \u20ac<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><em>*Napomena: To\u010dni iznosi ovise o finalnim uvjetima poziva. Prikazani iznosi su procjena na temelju najavljenih maksimuma (50% tro\u0161kova, do 6.000\u20ac FNE + do 5.600\u20ac baterija). Za ku\u0107anstva u energetskom siroma\u0161tvu (70%), iznosi su jo\u0161 povoljniji.<\/em><\/p>\n\n\n\n<p><strong>Klju\u010dni primjer:<\/strong>&nbsp;Na\u0161 najpopularniji paket (10 kW + 10 kWh baterija za 9.800 \u20ac) sa subvencijama za elektranu I bateriju pada na oko&nbsp;<strong>3.500 \u20ac<\/strong>. Za tu cifru dobivate sustav koji godi\u0161nje \u0161tedi 1.200\u20131.400 \u20ac. Povrat investicije:&nbsp;<strong>ispod 3 godine<\/strong>. To je nevjerojatna investicija.<\/p>\n\n\n\n<p>Za ku\u0107anstva u riziku od energetskog siroma\u0161tva (70% sufinanciranja)<\/p>\n\n\n\n<p>Paket 10 kW + 10 kWh za 9.800 \u20ac \u2192 subvencija ~6.860 \u20ac \u2192&nbsp;<strong>vi pla\u0107ate samo ~2.940 \u20ac<\/strong>. Ovo je prvi put da je kvalitetna solarna elektrana s baterijom dostupna za ispod 3.000 \u20ac.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"dokumentacija\"><span class=\"ez-toc-section\" id=\"Kompletni_popis_dokumentacije_%E2%80%94_checklist\"><\/span>Kompletni popis dokumentacije \u2014 checklist<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Ovo je dio gdje se ve\u0107ina prijava sru\u0161i. Prikazujemo dva scenarija \u2014 ovisno o tome ho\u0107e li FZOEU zahtijevati gotovu elektranu ili samo OOMP:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Scenarij_A_Prijava_s_OOMP-om_PRIJE_ugradnje_%E2%80%94_moguca_novost_za_2026\"><\/span>Scenarij A: Prijava s OOMP-om (PRIJE ugradnje) \u2014 mogu\u0107a novost za 2026.<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Ako se potvrdi da je za prijavu dovoljno imati samo OOMP, dokumentacija bi bila:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th class=\"has-text-align-left\" data-align=\"left\">#<\/th><th class=\"has-text-align-left\" data-align=\"left\">Dokument<\/th><th class=\"has-text-align-left\" data-align=\"left\">Tko ga izdaje<\/th><th class=\"has-text-align-right\" data-align=\"right\">Trajanje isho\u0111enja<\/th><\/tr><tr><td>1<\/td><td>Glavni elektrotehni\u010dki projekt<\/td><td>Ovla\u0161teni projektant (mi to radimo)<\/td><td class=\"has-text-align-right\" data-align=\"right\">5\u201315 dana<\/td><\/tr><tr><td>2<\/td><td>OOMP (Obavijest o mogu\u0107nosti priklju\u010denja)<\/td><td><a href=\"https:\/\/www.hep.hr\/ods\/\" target=\"_blank\" rel=\"noopener\">HEP ODS<\/a><\/td><td class=\"has-text-align-right\" data-align=\"right\">30\u201390 dana<\/td><\/tr><tr><td>3<\/td><td>Dokaz o legalnosti ku\u0107e<\/td><td>Katastar \/ Grad<\/td><td class=\"has-text-align-right\" data-align=\"right\">1\u20137 dana<\/td><\/tr><tr><td>4<\/td><td>Zemlji\u0161no-knji\u017eni izvadak<\/td><td>e-Gra\u0111ani \/ ZK ured<\/td><td class=\"has-text-align-right\" data-align=\"right\">Odmah (online)<\/td><\/tr><tr><td>5<\/td><td>Potvrda o prebivali\u0161tu<\/td><td>MUP \/ e-Gra\u0111ani<\/td><td class=\"has-text-align-right\" data-align=\"right\">Odmah (online)<\/td><\/tr><tr><td>6<\/td><td>Ponuda instalera s detaljnom specifikacijom<\/td><td>Instalater (mi)<\/td><td class=\"has-text-align-right\" data-align=\"right\">1\u20133 dana<\/td><\/tr><tr><td>7<\/td><td>Izjava prijavitelja (FZOEU obrazac)<\/td><td>Vi<\/td><td class=\"has-text-align-right\" data-align=\"right\">15 min<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Prednost ovog scenarija:<\/strong>&nbsp;Ne morate platiti 8.000\u201310.000 \u20ac za elektranu prije nego znate ho\u0107ete li dobiti subvenciju. Prijavite se s projektom i OOMP-om, sa\u010dekate odobrenje, i tek onda krenete u monta\u017eu. FZOEU bi nakon odobrenja dao rok (obi\u010dno 12\u201318 mjeseci) za realizaciju projekta i dostavu ra\u010duna\/potvrde o trajnom pogonu.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Scenarij_B_Prijava_s_gotovom_elektranom_dosadasnji_model\"><\/span>Scenarij B: Prijava s gotovom elektranom (dosada\u0161nji model)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Ako FZOEU zadr\u017ei stari model, trebat \u0107e vam sve iz Scenarija A, plus:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th class=\"has-text-align-left\" data-align=\"left\">#<\/th><th class=\"has-text-align-left\" data-align=\"left\">Dodatni dokument<\/th><th class=\"has-text-align-left\" data-align=\"left\">Tko ga izdaje<\/th><th class=\"has-text-align-right\" data-align=\"right\">Trajanje<\/th><\/tr><tr><td>+1<\/td><td>Ra\u010duni i potvrde o pla\u0107anju<\/td><td>Instalater (mi)<\/td><td class=\"has-text-align-right\" data-align=\"right\">Na dan monta\u017ee<\/td><\/tr><tr><td>+2<\/td><td>Potvrda o trajnom pogonu<\/td><td>HEP ODS<\/td><td class=\"has-text-align-right\" data-align=\"right\">15\u201345 dana nakon monta\u017ee<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>U oba scenarija,&nbsp;<strong>kriti\u010dni bottleneck je HEP<\/strong>&nbsp;\u2014 bilo da tra\u017eite OOMP ili EES, proces traje 30\u201390 dana. Zato je poruka ista:&nbsp;<strong>po\u010dnite s HEP procedurom ODMAH<\/strong>, bez obzira na koji scenarij natje\u010daj bude postavljen.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"vremenski-plan\"><span class=\"ez-toc-section\" id=\"Vremenski_plan_Subvencije_solarne_elektrane_2026_%E2%80%94_kad_sto_pripremiti\"><\/span>Vremenski plan: Subvencije solarne elektrane 2026 \u2014 kad \u0161to pripremiti<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Ako_vrijedi_Scenarij_A_dovoljan_OOMP_bez_gotove_elektrane\"><\/span>Ako vrijedi Scenarij A (dovoljan OOMP, bez gotove elektrane)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th class=\"has-text-align-left\" data-align=\"left\">Kad<\/th><th class=\"has-text-align-left\" data-align=\"left\">\u0160to napraviti<\/th><th class=\"has-text-align-right\" data-align=\"right\">Trajanje<\/th><\/tr><tr><td>ODMAH (travanj 2026)<\/td><td>Kontaktirajte instalera, preinspekcija krova, odaberite paket<\/td><td class=\"has-text-align-right\" data-align=\"right\">1\u20133 dana<\/td><\/tr><tr><td>Tjedan 1\u20132<\/td><td>Instalater izra\u0111uje glavni projekt i podnosi zahtjev HEP-u za OOMP<\/td><td class=\"has-text-align-right\" data-align=\"right\">5\u201315 dana<\/td><\/tr><tr><td>Tjedan 2\u20138<\/td><td>\u010cekanje na OOMP. Paralelno: prikupite ZK izvadak, dokaz legalnosti, prebivali\u0161te<\/td><td class=\"has-text-align-right\" data-align=\"right\">30\u201360 dana<\/td><\/tr><tr><td>DAN OBJAVE NATJE\u010cAJA<\/td><td>Sve spremno \u2014 prijavljujete se s OOMP-om i projektom<\/td><td class=\"has-text-align-right\" data-align=\"right\">15\u201330 min<\/td><\/tr><tr><td>Nakon odobrenja<\/td><td>Monta\u017ea + pu\u0161tanje u pogon + dostava ra\u010duna FZOEU-u<\/td><td class=\"has-text-align-right\" data-align=\"right\">1\u20133 mjeseca<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Prednost:<\/strong>&nbsp;Manje financijskog rizika \u2014 ne tro\u0161ite 10.000 \u20ac prije nego znate ho\u0107ete li dobiti subvenciju. Ukupno vrijeme pripreme: samo 1\u20132 mjeseca.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Ako_vrijedi_Scenarij_B_mora_biti_gotova_elektrana_dosadasnji_model\"><\/span>Ako vrijedi Scenarij B (mora biti gotova elektrana, dosada\u0161nji model)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th class=\"has-text-align-left\" data-align=\"left\">Kad<\/th><th class=\"has-text-align-left\" data-align=\"left\">\u0160to napraviti<\/th><th class=\"has-text-align-right\" data-align=\"right\">Trajanje<\/th><\/tr><tr><td>ODMAH (travanj 2026)<\/td><td>Kontaktirajte instalera, preinspekcija, odabir paketa<\/td><td class=\"has-text-align-right\" data-align=\"right\">1\u20133 dana<\/td><\/tr><tr><td>Tjedan 1\u20132<\/td><td>Instalater izra\u0111uje glavni projekt i podnosi zahtjev HEP-u za EES<\/td><td class=\"has-text-align-right\" data-align=\"right\">5\u201315 dana<\/td><\/tr><tr><td>Tjedan 2\u20138<\/td><td>\u010cekanje na HEP suglasnost. Paralelno: ostali dokumenti<\/td><td class=\"has-text-align-right\" data-align=\"right\">30\u201360 dana<\/td><\/tr><tr><td>Nakon EES<\/td><td>Monta\u017ea elektrane (1\u20132 dana) + pu\u0161tanje u pogon<\/td><td class=\"has-text-align-right\" data-align=\"right\">1\u20132 dana<\/td><\/tr><tr><td>Nakon monta\u017ee<\/td><td>HEP zamjena brojila i potvrda o trajnom pogonu<\/td><td class=\"has-text-align-right\" data-align=\"right\">15\u201345 dana<\/td><\/tr><tr><td>DAN OBJAVE NATJE\u010cAJA<\/td><td>Sve spremno \u2014 prijavljujete se s kompletnom dokumentacijom<\/td><td class=\"has-text-align-right\" data-align=\"right\">15\u201330 min<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Ukupno:<\/strong>&nbsp;2\u20133 mjeseca od starta do spremnosti. Ako krenete u travnju, spremni ste za lipanj\/srpanj.<\/p>\n\n\n\n<p><strong>Na\u0161 savjet bez obzira na scenarij:<\/strong>&nbsp;Krenite s projektom i HEP zahtjevom ODMAH. Ako natje\u010daj tra\u017ei samo OOMP \u2014 imate ga spremnog. Ako tra\u017ei gotovu elektranu \u2014 barem ste HEP proceduru pokrenuli na vrijeme i niste izgubili 2 mjeseca \u010dekaju\u0107i.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"korak-1\"><span class=\"ez-toc-section\" id=\"Korak_1_Odabir_instalera_i_glavni_projekt\"><\/span>Korak 1: Odabir instalera i glavni projekt<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Subvencije solarne elektrane 2026 zahtijevaju kvalitetnog instalera. Ovo je korak koji mnogi presko\u010de ili odrade povr\u0161no \u2014 i onda \u017eale. Evo \u0161to trebate od instalera:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Besplatna preinspekcija krova<\/strong>&nbsp;\u2014 instalater mora do\u0107i, pogledati krov, provjeriti stanje, orijentaciju, zasjenjenje, elektroormar i priklju\u010dak<\/li>\n\n\n\n<li><strong>Ponuda s detaljnom specifikacijom<\/strong>&nbsp;\u2014 koja oprema (brend, model, snaga), \u0161to je uklju\u010deno, \u0161to nije<\/li>\n\n\n\n<li><strong>Glavni projekt<\/strong>&nbsp;\u2014 jednolinijska shema, tehni\u010dki opis, specifikacija. Ovo je dokument koji HEP tra\u017ei za EES i FZOEU tra\u017ei za prijavu<\/li>\n\n\n\n<li><strong>Iskustvo s FZOEU natje\u010dajima<\/strong>&nbsp;\u2014 instalater koji je pro\u0161ao proceduru zna koje gre\u0161ke izbjegavati<\/li>\n<\/ul>\n\n\n\n<p>Kod nas u&nbsp;<a href=\"https:\/\/zenerg.hr\/\">Zenerg-u<\/a>, glavni projekt izra\u0111ujemo u roku 5\u201310 radnih dana od preinspekcije, a zahtjev HEP-u \u0161aljemo isti dan kad je projekt gotov. Sve dokumentiranje vodimo digitalno pa je prijava na eFZOEU sustav pitanje 15 minuta kad do\u0111e vrijeme.<\/p>\n\n\n\n<p>Za&nbsp;<a href=\"https:\/\/zenerg.hr\/blog\/koliko-stvarno-kosta-solarna-elektrana-u-2026-transparentni-cjenik-od-instalera\/\">detaljan cjenik i usporedbu paketa pogledajte na\u0161 \u010dlanak o cijenama<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"korak-2\"><span class=\"ez-toc-section\" id=\"Korak_2_HEP_suglasnost_EES_ili_OOMP\"><\/span>Korak 2: HEP suglasnost (EES ili OOMP)<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Nakon izrade projekta, podnosi se zahtjev&nbsp;<a href=\"https:\/\/www.hep.hr\/ods\/\" target=\"_blank\" rel=\"noreferrer noopener\">HEP ODS-u<\/a>&nbsp;za elektroenergetsku suglasnost (EES) ili obavijest o mogu\u0107nosti priklju\u010denja (OOMP). Ovo je dokument koji ka\u017ee: &#8220;Da, va\u0161a ku\u0107a mo\u017ee priklju\u010diti solarnu elektranu ove snage na na\u0161u mre\u017eu.&#8221;<\/p>\n\n\n\n<p><strong>Koliko traje:<\/strong>&nbsp;Slu\u017ebeni rok je 30 dana, ali u praksi \u2014 ovisno o distribucijskom podru\u010dju i optere\u0107enosti \u2014 mo\u017ee trajati 45\u201390 dana. Zagreb i okolica (DP Elektra Zagreb) su obi\u010dno br\u017ei od nekih manjih podru\u010dja.<\/p>\n\n\n\n<p><strong>Savjet iz prakse:<\/strong>&nbsp;Zahtjev mora biti uredan od prvog puta. Ako HEP vrati zahtjev na ispravak (a to se doga\u0111a kod neiskusnih projektanata), gubite 2\u20134 tjedna. Mi u Zenerg-u imamo svakodnevnu komunikaciju s HEP ODS-om i poznajemo specifi\u010dnosti svakog distribucijskog podru\u010dja \u2014 zahtjevi nam prolaze iz prve u 95% slu\u010dajeva.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"korak-3\"><span class=\"ez-toc-section\" id=\"Korak_3_Montaza_i_pustanje_u_pogon\"><\/span>Korak 3: Monta\u017ea i pu\u0161tanje u pogon<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Kad dobijete HEP suglasnost, monta\u017ea mo\u017ee po\u010deti. Kod nas to izgleda ovako:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Dan 1:<\/strong>&nbsp;Postavljanje nosa\u010da i panela na krov, DC kabliranje<\/li>\n\n\n\n<li><strong>Dan 2:<\/strong>&nbsp;Monta\u017ea invertera, AC kabliranje, elektro-ormar, SPD za\u0161tita, pu\u0161tanje u pogon, testiranje, konfiguracija aplikacije<\/li>\n<\/ul>\n\n\n\n<p>Nakon monta\u017ee, obavje\u0161tavamo HEP da je elektrana spremna za zamjenu brojila. HEP dolazi, mijenja staro brojilo za dvosmjerno (smart meter), i izdaje&nbsp;<strong>potvrdu o trajnom pogonu<\/strong>&nbsp;\u2014 dokument koji vam treba za FZOEU prijavu.<\/p>\n\n\n\n<p><strong>Koliko traje zamjena brojila:<\/strong>&nbsp;15\u201345 dana od na\u0161eg zahtjeva. U sezoni (svibanj\u2013rujan) mo\u017ee biti i du\u017ee jer je HEP optere\u0107en.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"korak-4\"><span class=\"ez-toc-section\" id=\"Korak_4_Prijava_na_eFZOEU_%E2%80%94_dan_D\"><\/span>Korak 4: Prijava na eFZOEU \u2014 dan D<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Prijava za subvencije solarne elektrane 2026 podnosi se elektroni\u010dki putem&nbsp;<a href=\"https:\/\/efzoeu.fzoeu.hr\/\" target=\"_blank\" rel=\"noreferrer noopener\">sustava eFZOEU<\/a>. Pristup je putem&nbsp;<strong>NIAS vjerodajnica<\/strong>&nbsp;(eGra\u0111ani \u2014 token, mToken ili osobna iskaznica s \u010dipom).<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sto_pripremiti_za_dan_prijave\"><\/span>\u0160to pripremiti za dan prijave<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Skenirane dokumente u PDF-u<\/strong>&nbsp;\u2014 projekt, EES, ra\u010duni, ZK izvadak, legalnost, potvrda o trajnom pogonu<\/li>\n\n\n\n<li><strong>Pristup eGra\u0111ani<\/strong>&nbsp;\u2014 provjerite UNAPRIJED da vam tokeni rade! Na dan natje\u010daja nije vrijeme za resetiranje lozinki<\/li>\n\n\n\n<li><strong>Ispunjen prijavni obrazac<\/strong>&nbsp;\u2014 FZOEU objavljuje obrasce s natje\u010dajem, ali format je sli\u010dan svake godine<\/li>\n\n\n\n<li><strong>Izjavu prijavitelja<\/strong>&nbsp;\u2014 potpisanu i skeniranu<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Kako_izgleda_sam_proces_prijave\"><\/span>Kako izgleda sam proces prijave<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Na dan otvaranja natje\u010daja (obi\u010dno u 9:00 ujutro), sustav postane dostupan za prijavu. Princip je&nbsp;<strong>&#8220;najbr\u017ei prst&#8221;<\/strong>&nbsp;\u2014 prijave se obra\u0111uju redom primanja. Kad se sredstva potro\u0161e, natje\u010daj se zatvara.<\/p>\n\n\n\n<p><strong>Prakti\u010dni savjeti:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Budite za ra\u010dunalom u 8:50. Osvje\u017eavajte stranicu od 8:55.<\/li>\n\n\n\n<li>Imajte sve PDF-ove unaprijed poredane u jednu mapu na desktopu<\/li>\n\n\n\n<li>Koristite brzu internetsku vezu \u2014 ne mobilnu mre\u017eu<\/li>\n\n\n\n<li>Ako mo\u017eete, neka vam netko pomogne s uploadom dokumenata dok vi ispunjavate obrasce<\/li>\n\n\n\n<li>Ili \u2014 dajte specijalnu punomo\u0107 instalateru (ovjerenu kod javnog bilje\u017enika) da prijavu podnese u va\u0161e ime. Mi to radimo za na\u0161e klijente.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"korak-5\"><span class=\"ez-toc-section\" id=\"Korak_5_Nakon_prijave_%E2%80%94_sto_ocekivati\"><\/span>Korak 5: Nakon prijave \u2014 \u0161to o\u010dekivati<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Ako ste uspje\u0161no podnijeli prijavu za subvencije solarne elektrane 2026, evo \u0161to slijedi. Nakon \u0161to podnesete prijavu:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Provjera urednosti (15\u201330 dana):<\/strong>&nbsp;FZOEU provjerava je li dokumentacija kompletna i ispravna<\/li>\n\n\n\n<li><strong>Zahtjev za dopunu (ako treba):<\/strong>&nbsp;Ako ne\u0161to nedostaje, \u0161alju zahtjev za dopunom s rokom od 8\u201315 dana<\/li>\n\n\n\n<li><strong>Odluka o dodjeli:<\/strong>&nbsp;Ako je sve uredu, dobijete obavijest o odobrenju<\/li>\n\n\n\n<li><strong>Ugovor s Fondom:<\/strong>&nbsp;Potpisujete ugovor o sufinanciranju<\/li>\n\n\n\n<li><strong>Isplata:<\/strong>&nbsp;FZOEU ispla\u0107uje sredstva na va\u0161 ra\u010dun. Rokovi variraju \u2014 obi\u010dno 30\u201390 dana od sklapanja ugovora<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"najcesce-greske\"><span class=\"ez-toc-section\" id=\"7_gresaka_koje_ubijaju_prijavu_za_subvencije_solarne_elektrane_2026\"><\/span>7 gre\u0161aka koje ubijaju prijavu za subvencije solarne elektrane 2026<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Greska_1_Cekanje_objave_natjecaja_da_se_krene_s_pripremom\"><\/span>Gre\u0161ka 1: \u010cekanje objave natje\u010daja da se krene s pripremom<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Subvencije solarne elektrane 2026 zahtijevaju pripremu. Bez obzira na model natje\u010daja (samo OOMP ili gotova elektrana), HEP procedura traje 30\u201390 dana. Ako \u010dekate objavu natje\u010daja da tek onda kontaktirate instalera \u2014 zakasnili ste. Pokrenite izradu projekta i HEP zahtjev odmah. U najgorem slu\u010daju, imate OOMP spreman &#8220;u ladici.&#8221; U najboljem, imate gotovu elektranu i spremni ste prijaviti se u minutu.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Greska_2_Nepotpuna_dokumentacija\"><\/span>Gre\u0161ka 2: Nepotpuna dokumentacija<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Na subvencije solarne elektrane 2026 o\u010dekuje se veliki interes. Pro\u0161le godine tisu\u0107e prijava je odbijeno jer su nedostajali dokumenti ili su bili neispravni. Naj\u010de\u0161\u0107e: nedostaje ZK izvadak, kriva adresa na prebivali\u0161tu, projekt nije u skladu s EES-om, ra\u010dun nema detaljnu specifikaciju opreme.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Greska_3_Projekt_ne_odgovara_stvarno_ugradenoj_opremi\"><\/span>Gre\u0161ka 3: Projekt ne odgovara stvarno ugra\u0111enoj opremi<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Ako u projektu pi\u0161e &#8220;Trina 445W&#8221; a na krovu su &#8220;Trina 455W&#8221; \u2014 to je neuskla\u0111enost koja mo\u017ee biti razlog za odbijanje. Projekt i stvarna instalacija moraju se 100% poklapati.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Greska_4_Paneli_ne_zadovoljavaju_tehnicki_minimum\"><\/span>Gre\u0161ka 4: Paneli ne zadovoljavaju tehni\u010dki minimum<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>FZOEU tra\u017ei panele s minimalno 18% korisnog djelovanja. Ako ste instalirali jeftine panele sa 17,5% \u2014 prijava se odbija. Svi Tier 1 paneli (Trina, Jinko, Canadian, Longi) ovo bez problema zadovoljavaju, ali neka &#8220;no-name&#8221; roba ne.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Greska_5_Kuca_nije_legalizirana\"><\/span>Gre\u0161ka 5: Ku\u0107a nije legalizirana<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Iznena\u0111uju\u0107e \u010dest problem. Ku\u0107a je gra\u0111ena 1980-ih, nikad formalno dovr\u0161ena legalizacija. Bez valjanog dokaza o legalnosti \u2014 nema subvencije. Provjerite ovo ODMAH \u2014 legalizacija mo\u017ee trajati mjesecima.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Greska_6_Neispravan_pristup_eGradani_na_dan_prijave\"><\/span>Gre\u0161ka 6: Neispravan pristup eGra\u0111ani na dan prijave<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Ljudi zaborave lozinku, token ne radi, certifikat na osobnoj istekao. Na dan natje\u010daja ne mo\u017eete to rje\u0161avati \u2014 red u FINA-i je 3 sata. Provjerite pristup tjedan dana ranije.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Greska_7_Odabir_instalera_koji_ne_poznaje_FZOEU_proceduru\"><\/span>Gre\u0161ka 7: Odabir instalera koji ne poznaje FZOEU proceduru<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Instalater koji ne zna koji format projekta FZOEU tra\u017ei, koji ne izdaje R1 ra\u010dun s detaljnom specifikacijom, koji ne poznaje razliku izme\u0111u EES i OOMP \u2014 takav instalater vam je ve\u0107i problem od samog natje\u010daja. Birajte instalera koji je ve\u0107 uspje\u0161no proveo klijente kroz FZOEU natje\u010daj.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"lokalne-subvencije\"><span class=\"ez-toc-section\" id=\"Lokalne_subvencije_%E2%80%94_dodatnih_400%E2%80%931000_E_povrh_FZOEU\"><\/span>Lokalne subvencije \u2014 dodatnih 400\u20131.000 \u20ac povrh FZOEU<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Subvencije solarne elektrane 2026 nisu ograni\u010dene samo na FZOEU. Osim FZOEU-a, mnogi gradovi i op\u0107ine nude&nbsp;<strong>dodatne lokalne subvencije<\/strong>&nbsp;koje se mogu kombinirati s dr\u017eavnim. Evo nekih primjera iz na\u0161eg podru\u010dja:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th class=\"has-text-align-left\" data-align=\"left\">Grad\/op\u0107ina<\/th><th class=\"has-text-align-left\" data-align=\"left\">Program<\/th><th class=\"has-text-align-right\" data-align=\"right\">Dodatni iznos<\/th><th class=\"has-text-align-left\" data-align=\"left\">Napomena<\/th><\/tr><tr><td>Samobor<\/td><td>Sufinanciranje ener. obnove<\/td><td class=\"has-text-align-right\" data-align=\"right\">Do 10% (maks. 1.000 \u20ac)<\/td><td>Za projekte odobrene od FZOEU-a<\/td><\/tr><tr><td>Grad Zagreb<\/td><td>Zeleni Zagreb program<\/td><td class=\"has-text-align-right\" data-align=\"right\">Varira<\/td><td>Provjerite aktualne pozive na zagreb.hr<\/td><\/tr><tr><td>Razne op\u0107ine<\/td><td>Lokalni programi OIE<\/td><td class=\"has-text-align-right\" data-align=\"right\">400\u20131.350 \u20ac\/kW<\/td><td>Razli\u010diti uvjeti po op\u0107inama<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Savjet:<\/strong>&nbsp;Subvencije solarne elektrane 2026 nisu jedina opcija. Provjerite s va\u0161om gradskom\/op\u0107inskom upravom postoji li lokalni program sufinanciranja. Mnogi se mogu kombinirati s FZOEU subvencijom \u2014 \u0161to zna\u010di da va\u0161a realna cijena pada jo\u0161 ni\u017ee. Na primjer: 10 kW sustav za 9.800 \u20ac \u2014 FZOEU vrati 4.900 \u20ac, Samobor vrati 1.000 \u20ac \u2014 va\u0161 tro\u0161ak:&nbsp;<strong>3.900 \u20ac<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"faq\"><span class=\"ez-toc-section\" id=\"Najcesca_pitanja_o_subvencijama_za_solarne_elektrane_2026\"><\/span>Naj\u010de\u0161\u0107a pitanja o subvencijama za solarne elektrane 2026<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><strong>Mogu li se prijaviti ako jo\u0161 nisam ugradio elektranu?<\/strong><\/p>\n\n\n\n<p>Mogu\u0107e da DA \u2014 za 2026. postoje naznake da bi FZOEU mogao prihva\u0107ati prijave samo s OOMP-om (bez gotove elektrane). To bi bila velika promjena nabolje jer smanjuje financijski rizik za ku\u0107evlasnike. Me\u0111utim, ovo jo\u0161 nije slu\u017ebeno potvr\u0111eno. Dosada\u0161nji FZOEU pozivi za FNE zahtijevali su da elektrana bude pu\u0161tena u pogon PRIJE prijave. Pratite slu\u017ebene objave na&nbsp;<a href=\"https:\/\/www.fzoeu.hr\/\" target=\"_blank\" rel=\"noreferrer noopener\">fzoeu.hr<\/a>&nbsp;\u2014 mi \u0107emo a\u017eurirati ovaj \u010dlanak \u010dim budu poznati to\u010dni uvjeti.<strong>\u0160to ako ne dobijem subvenciju \u2014 isplati li se i bez nje?<\/strong><\/p>\n\n\n\n<p>Da. Bez subvencije, povrat investicije za na\u0161 najpopularniji paket (10 kW + 10 kWh) je 7\u20138 godina. Sa subvencijom: 3,5\u20134 godine. Razlika je u brzini povrata, ne u tome isplati li se ili ne. Solarna elektrana se isplati u svakom scenariju \u2014 subvencija samo ubrzava povrat.<strong>Mo\u017ee li instalater podnijeti prijavu umjesto mene?<\/strong><\/p>\n\n\n\n<p>Da, uz&nbsp;<strong>specijalnu punomo\u0107 ovjerenu kod javnog bilje\u017enika<\/strong>. FZOEU prihva\u0107a opunomo\u0107enike. Mi u Zenerg-u nudimo ovu uslugu za klijente koji ne \u017eele sami prolaziti kroz eFZOEU sustav \u2014 pripremimo dokumentaciju i podnesemo prijavu u va\u0161e ime na dan otvaranja natje\u010daja.<strong>Koliko dugo traje od prijave do isplate?<\/strong><\/p>\n\n\n\n<p>Iz iskustva: 2\u20136 mjeseci od prijave do isplate. FZOEU najprije provjerava dokumentaciju (15\u201330 dana), potom donosi odluku, pa slijedi ugovor i isplata. Ubrzavate proces tako da imate 100% urednu dokumentaciju od prvog dana \u2014 bez dopuna i ispravaka.<strong>Je li PDV 0% i dalje na snazi?<\/strong><\/p>\n\n\n\n<p>Da, u 2026. godini PDV na solarne elektrane za ku\u0107anstva je 0%. To zna\u010di da su cijene u ponudi = finalne cijene. Ova pogodnost ne\u0107e trajati zauvijek \u2014 kad se ukine, cijena svake instalacije raste za 25%.<strong>Mogu li kombinirati FZOEU subvenciju s lokalnom?<\/strong><\/p>\n\n\n\n<p>U ve\u0107ini slu\u010dajeva \u2014 da. Lokalne subvencije (grad, op\u0107ina, \u017eupanija) se obi\u010dno mogu kombinirati s dr\u017eavnima, ali ukupno sufinanciranje ne smije prelaziti 100% tro\u0161kova. Svaki lokalni program ima svoje uvjete \u2014 provjerite prije prijave.<\/p>\n\n\n\n<p>Povezani vodi\u010di na zenerg.hr<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/zenerg.hr\/blog\/koliko-stvarno-kosta-solarna-elektrana-u-2026-transparentni-cjenik-od-instalera\/\">Cijena solarne elektrane 2026 \u2014 transparentni cjenik<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/zenerg.hr\/blog\/net-billing-hrvatska-2026-stvarni-izracun-s-formulom-iz-zakona-ne-pausalni-brojevi\/\">Net billing 2026 \u2014 stvarni izra\u010dun s formulom iz zakona<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/zenerg.hr\/blog\/solarne-elektrane-s-baterijom-10kwlfp-15kwh-10-000e\/\">Solarne elektrane s baterijom \u2014 LFP paketi<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/zenerg.hr\/subvencije-solarne-elektrane\/\">Subvencije za solarne elektrane \u2014 servisna stranica<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/zenerg.hr\/kalkulator\/\">Besplatni kalkulator u\u0161tede \u2192<\/a><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Zakljucak_%E2%80%94_subvencije_solarne_elektrane_2026_%E2%80%94_ne_cekajte_natjecaj_pripremite_se_sad\"><\/span>Zaklju\u010dak \u2014 subvencije solarne elektrane 2026 \u2014 ne \u010dekajte natje\u010daj, pripremite se sad<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>FZOEU natje\u010daj za 2026. dolazi s 20 milijuna eura i po prvi put uklju\u010duje baterije. To zna\u010di da mo\u017eete dobiti subvenciju za kompletni hibridni sustav (solarna + baterija) \u2014 sustav koji je s net billingom financijski najisplativiji.<\/p>\n\n\n\n<p>Ali \u2014 novac se dijeli po redu pristiglih urednih prijava. &#8220;Urednih&#8221; je klju\u010dna rije\u010d. Imati sve dokumente spremne na dan otvaranja natje\u010daja razlika je izme\u0111u toga ho\u0107ete li dobiti subvenciju ili ne.<\/p>\n\n\n\n<p>Subvencije solarne elektrane 2026 su prilika koja se ne propu\u0161ta. Po\u010dnite danas: kontaktirajte instalera, napravite preinspekciju, pokrenite projekt i HEP proceduru. Za 2\u20133 mjeseca imate sve u ladici \u2014 i kad natje\u010daj krene, vi ste spremni u 15 minuta.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u270d\ufe0f&nbsp;Jurica Brekalo \u0160trbi\u0107&nbsp;\u2014 Ovla\u0161teni instalater solarnih sustava, diplomirani in\u017eenjer elektrotehnike (FER). Osniva\u010d Zenerg d.o.o., 200+ instalacija u Hrvatskoj.&nbsp;Saznajte vi\u0161e \u2192 FZOEU natje\u010daj FZOEU natje\u010daj za subvencije za solarne elektrane u&#8230;<\/p>\n","protected":false},"author":1,"featured_media":393,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,2,4],"tags":[],"class_list":["post-388","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-vijesti","category-vodici","category-zakonodavstvo"],"_links":{"self":[{"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/posts\/388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/comments?post=388"}],"version-history":[{"count":5,"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/posts\/388\/revisions"}],"predecessor-version":[{"id":400,"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/posts\/388\/revisions\/400"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/media\/393"}],"wp:attachment":[{"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/media?parent=388"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/categories?post=388"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zenerg.hr\/blog\/wp-json\/wp\/v2\/tags?post=388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}